This project wrapped around Fairview and Blue Lake and included 11,000LF of aged sewer pipeline ranging from 6”-12” in diameter. An interesting challenge of this project was that the manholes were located on the lake and not on the roadway. This called for our team to maneuver our UV curing unit as well as the materials to our access point without disturbing the wetland-like area.
Project Details
Client: City of Fairview
Date: December 2019 - March 2020